ERTMS autonomous train – Fret line in Australia
 
                         ERTMS autonomous train – Fret line in Australia
 2012 - 2018
 1 700 km
Rio Tinto, the world’s first fully automated train, operates about 200 locomotives on more than 1,700 kilometres of track in the Pilbara, Western Australia, transporting ore from 16 mines to four port terminals. It was monitored remotely by operators from Rio Tinto’s Operations Centre in Perth more than 1,500 kilometres away.
Other
Client : Rio Tinto
Compagnie des Signaux participated to the project delivering up to 200 on-board units.
Others references
ERTMS on-board systems in India
 2005 - 2008
 130 units
Conventional lines
Control station and centralized command
 Since 1990
 8 PCC
Conventional lines, High Speed Signaling, Other
HSL in France
 1981 à 2024
 2 500 km
High Speed Signaling
Morocco: Tangiers-Kenitra HSL
 2013 - 2018
 183 km
High Speed Signaling
Spain: Madrid-Lleida HSL
 2000 - 2011
 460 km
High Speed Signaling
ERTMS/TVM on-board systems in Europe
 Since 2004
 600 trains
High Speed Signaling
UK: High Speed 1
 2000 - 2007
 114 km
High Speed Signaling
HSL in China
 1989 - 2009
 3 315 km
High Speed Signaling
HSL in South Korea
 1994 to 2016
 591 km
High Speed Signaling
Conventional lines in France
 Since 2005
 32 workstations equipped
Conventional lines
Conventional lines in the UK
 2007 - 2018
 215 km
Conventional lines
Paris Metro and Tramway Maintenance
 Since 1913
 220 km
Other